Scotland TranServ, on behalf of Transport Scotland will resurface 0.8km of the M80 Southbound between Junction 2 off-slip and on-slip.
Working in consultation with the local authority and Police Scotland, the £175k project has been specifically scheduled for weekend overnights from Friday 15th until Sunday 17th September.
Rajan Singh, Scotland TranServ’s Assistant Engineer said:
“Scotland TranServ is working with local authorities, Police Scotland and key local stakeholders to ensure our improvement projects are delivered with minimal disruption in mind. This is a busy stretch of trunk road and the scheme has therefore been scheduled outwith the peak commuter periods.
“Our aim throughout the works is to keep overnight traffic as free flowing as possible. Only once the vehicle flow is sufficiently low will we implement traffic management.”
The health and safety of our workers and of the travelling public is of paramount importance to Scotland TranServ, and therefore it will be necessary to implement an overnight closure of the M80 Southbound between the Junction 2 off-slip and on-slip.
It is proposed that traffic management will be installed from 8pm each evening of the works until 7am the following morning on both the Friday and Saturday periods of overnight working. The Sunday evening works will operate from 8pm until 6am on Monday 19th September, ahead of peak commuter traffic flow.